Pictures in 2007



He is crushing rocks with drill.


They are setting up foundation blocks.


Mini crawler crane is still active this year.


Mauna Kea is behind them.


The weather seems to have been a little bad this day.


We carefully returned the roof of the shelter after instllation.


The frame of high altitude light collector was build.


We moved the detector from adjusting room ...to the sheltor.


...to the sheltor.



They are installing the shutter to the low altitude light collector..


Low altitude light collector seen from entrance of main station.



Panorama of sub-station.


Panorama of main station.


Ashra Mauna Loa site panorama.


Support adjustment mechanism of mirror.
This picture was taken from the back side of the mirror.



The crane is hanging the light collection lens system.


High school students came for a visit.